Control of conformity of production (COP)
Manager
Roman Nadratowski
Control of conformity of production is an assessment necessary for the full implementation of the type-approval procedure.
The inspection requirement is contained in EU Regulations, UN Regulations and the “Geneva” agreement, which sets uniform technical requirements for vehicles, equipment and parts.
The manufacturer is obliged to ensure within the framework of the implemented management system (based on the requirements of ISO 9001) that the production of approved types is planned and subject to appropriate control and testing.
Lukasiewicz – PIMOT conducts production conformity inspections on the basis of authority granted.
The results of the production conformity inspection are used in the approval procedure by:
- Director of Transport Technical Supervision – TDT (e20,E20),
- Latvian Homologation Authority – CSDD, CST (e32/E32).
Feel free to contact us!
Useful forms
INQUIRY / QUOTATION | |
1.1 | Contact the manufacturer’s representative with the Lukasiewicz – PIMOT Homologation Section or send an inquiry to the e-mail address. |
| Please indicate in your request: A. name and address of the manufacturer, Tax ID No, B. place of production (assembly) and company name, if different from the manufacturer’s name, C. the name of the vehicle, the part to be approved, the purpose of the vehicle, the part, D. the number of the regulation, regulation (optional) in accordance with which the approval procedure will be carried out, E. contact person (manufacturer’s representative), phone, email address. |
1.2 | Lukasiewicz – PIMOT contact with the manufacturer’s representative (if necessary to determine the scope of control and data of the manufacturer, the place of production). |
1.3 | Preparation of a production conformity control offer. |
1.4 | The offer specifies the scope of the inspection, the legal acts used in the approval procedure, and the terms of the service. |
1.5 | The offer is sent to the e-mail address of the manufacturer’s representative. |
ORDERING/PLANNING CONTROLS | |
2.1 | Ordering production compliance inspection service (i.e., sending a signed order – the form indicated in the bid). |
2.2 | Making a prepayment in accordance with the terms of the offer. |
2.3 | Transmission of data and documentation, necessary for the planning of inspections (according to the offer / arrangements with the staff of the Approval Section). |
2.4 | Preparation of an inspection plan by the lead auditor. Approval of the inspection plan by the manufacturer’s representative. |
ADVERTISEMENT | |
3.1 | Implementation of production compliance inspections in accordance with the inspection plan (on-site or remotely, if so agreed). |
3.2 | Establishment of a corrective or corrective action plan by the manufacturer, if the result of the inspection indicates the need for improvement or removal of nonconformities (optional, if applicable). |
3.3 | Issuance of a protocol for production conformity inspection. The protocol shall specify the expiration date of the inspection. |
3.4 | The inspection protocol is received by the manufacturer and the approval authority. |